Project Timeline
In the Fall of 2022, the under-utilized Bingham gymnasium was converted into two spaces: a storage area with lockers for our growing day student population, and a student center: a recreation space with seating, a gaming system, ping pong tables, and an air hockey table.
Beginning in the Spring of 2023 and continuing until 2024, Bingham Auditorium will be renovated and outfitted with state of the art A/V systems. These improvements are made possible through the generosity of the Tony and Renee Marlon Charitable Foundation.
In the Summer of 2024, the North Quad area will be transformed into a purposeful outdoor gathering space, including fire pits, and an amphitheater thanks to the generosity of the Betterment Fund and the Baton Rouge Area Foundation.
At the base of the amphitheater in the North Quad the “Alumni Courtyard” is being constructed through a series of different size stone pavers. This area will be used for Alumni gatherings during Alumni weekends as well as student traditions that symbolize moving from being a student to being an Alumni.